June 17, 2016


Warning: count(): Parameter must be an array or an object that implements Countable in /home/southeas/public_html/wp-content/plugins/q-and-a/inc/functions.php on line 252

SouthEast Connector Project: May 2016 Flyover Video

Dear Stakeholder:

The project team has created the second of a series of flyover videos showcasing Phase 2 construction progress. Each video begins at the southern end of the project (Segment 1) at the current intersection of South Meadows Parkway and Veterans Parkway and concludes at the northern end of the project at Clean Water Way (Segment 4).

Construction advancements since April’s video include:
• Haul road completed from Clean Water Way to South Meadows Parkway.
• Boynton Slough Bridge construction begins.
• Pile driving at Rosewood Lakes Bridge location begins.
• Earthwork through Rosewood Lakes Golf Course.
• Realignment of Steamboat Creek at Mira Loma Drive.

You can watch the latest flyover video, and other videos featuring important aspects of the project, by visiting the ‘Videos’ page on the project website here. You can also subscribe to the SouthEast Connector Project and RTC Washoe channels on YouTube.

For more information please call the project hotline at (775) 789-9832 or email Info@SouthEastConnector.com. For additional information and to sign-up to receive updates visit SouthEastConnector.com

Your RTC. Our Community. | rtcwashoe.com

Written by