August 26, 2016


Warning: count(): Parameter must be an array or an object that implements Countable in /home/southeas/public_html/wp-content/plugins/q-and-a/inc/functions.php on line 252

Structures Receive Final Portion of Aesthetic Treatment

Dear Stakeholder:

Structures between Clean Water Way and Pembroke Drive were painted this week as the final portion of aesthetic treatment of the concrete surfaces. Structures include: four equalizing culverts, the Yori Drain Bridge columns and the mechanically stabilized earth (MSE) walls off of the Clean Water Way Bridge which was completed in Phase 1.

The paint colors as well as the pattern designs for structures throughout the project were chosen by the project’s Community Working Group (CWG) to complement the surrounding environment and scenery. The CWG was comprised of a diverse group of citizens representing community-wide organizations and neighborhoods to develop community-based decisions on the project throughout the design process.

“The Road Ahead” with RTC

You can view the latest “Road Ahead” news feature with KOLO TV Channel 8 here for more project updates.

For more information please call the project hotline at (775) 789-9832 or email Info@SouthEastConnector.com. For additional information and to sign-up to receive updates visit SouthEastConnector.com

Your RTC. Our Community.  | rtcwashoe.com

Before-and-after look of the equalizing culverts.

DSCN4497

 

 

DSCN4494

Painted mechanically stabilized earth (MSE) walls near Clean Water Way.

DSCN4567

Painted columns at the new Yori Drain Bridge.

Written by