Traffic Updates for Clean Water Way and Alexander Lake Road

Dear Stakeholder:

Traffic on Clean Water Way will be switched back to the original road alignment and speed limit the week of August 22, 2016. A temporary road diversion with reduced speed limit has been in effect on Clean Water Way since June 2016 for construction of an equalizing drainage structure underneath the existing roadway.

Production of a temporary diversion of Alexander Lake Road is also underway for construction of an equalizing drainage structure. Beginning the week of August 22, 2016, signage and flaggers will alert motorists to slow down to 15 mph and signal them to use the diversion.

Temporary road diversion on Clean Water Way.

Temporary road diversion on Clean Water Way.

Take the Website Survey

Please take a moment to complete the online survey at southeastconnector.com. The RTC values your feedback.

Watch “The Road Ahead”

Watch “The Road Ahead with RTC” on KOLO TV Channel 8 on August 23, 24 and 25 for a project update.

For more information please call the project hotline at (775) 789-9832 or email Info@SouthEastConnector.com. For additional information and to sign-up to receive updates visit SouthEastConnector.com

Your RTC. Our Community.  | rtcwashoe.com

Written by